Login:
Stimmen - 3, Durchschnittliche Bewertung: 4.3 ( )

Anleitung Sears, modell N9MP1125J20B1

Hersteller: Sears
Dateigröße: 3.24 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


• A 2" PVC coupling fastened onto the Drain Tee (*9MPD Mount the Trap externally to the bottom side of the unit using the models) 2 screws provided in the location shown. Install Tee Trap into bottom section of Tee. Cut the corrugated tube as shown in the illustration above. Con- Important: The pipe to the Tee Trap must be level or sloping to nect the corrugated hose from the transition to the Trap. Secure wards the Tee Trap connections with clamps. Connect the black 1/2" ID Drain Tube from the Vent Drain to the Connect the Tee trap and the main drain line exiting the casing as Trap. If an extension is required, use the 1/2" OU barbed coupling shown in Figure 18. and the black 1/2" ID Drain Tube in the loose parts bag. Cut tube Note: It is recommended that all PVC piping and fitting connecto length. Secure connections with clamps. tions be fit up and inspected before final cementing. Both the ex- Connect the 3/16" ID relief tube to the middle port on the Trap. If ternal Trap and the external Tee Trap must be primed before an extension is required, use the clear 3/16"OD splice connector operation. Verify all condensate drain connections are securely and the black 3/16" ID relief tube in the loose parts bag. Cut tube clamped. A coupling and clamps (in loose part bag) may be to length. installed as shown for future servicing of the vent system. [_ 440 01 1020 04 iiiiiiiiiiiiiiiiiiiiiiiiiiii!.I.!!i!i!!!i. !!ii.!ii ii.I .I.I .I.I.I.!jijii ii ii!!iil i!ii!i Connecting Tee Trap to Condensate Trap and Main Drain Line Open Tee \ Tee Trap/_---_ Evaporator Coil Drain Line (Optional)-.................._]_E Main Drain Line & The Tee Trap must be connected to the main condensate drain line as conceptually shown above. Different installations may require slightly different orientations. The following steps apply to all installations. 2. The Tee Trap should be installed as close to the side or top of the furnace as practical. Minimize the distance between the inducer and the Tee Trap as much as possible. 3. An open tee is to be used at the Tee Trap discharge. The top end of the tee should be open to the atmosphere to eliminate potential air lock problems. 4. The drain line from the Tee Trap is to be connected to the furnace condensate trap drain line as shown above. 5. Condensate drain lines from a cooling coil may be connected downstream of the connection point of the Tee Trap and Furnace Condensate Trap. Important: Prime both traps with water before operation. Failure to prime the traps may result in discharge of flue gases from the condensate drain line and open tee for a period of time, and may result in temporary lockout of the furnace upon start up. Main drain line construction is left to the discretion of the installer. It may be made of either ridged pipe or flexible tube. Tube ID should NOT be less than 1/2,,. 44001 102004 EB Condensate Trap ,m o o_ / 25-24-41N Connecting Vent and Combustion Air Piping CARBON MONOXIDE POISONING HAZARD Failure to properly seal vent piping could result in death, personal injury and/or property damage. Cement or mechanically seal alljoints, fittings, etc. to prevent leakage of flue gases. Refer to Figure 9 through Figure 17 that corresponds to the installation position of the furnace for the application. Preassemble the vent and combustion air piping from the furnace to the vent termination. Do not cement the pipe joints until the pipe preassembly process is complete. Combustion Air Pipe Connection (Dual Certified or Direct Vent) Install the air intake coupling and gasket to the furnace with the four(4) screws. Note: The air intake cou piing and gasket ca n be installed to the top panel to the alternate air intake locations on either the left or right side panels of the furnace. For downflow installation, the air intake coupling and gasket must be installed to the alternate air intake location on either the left or right side panels. Remove the 3" hole plug from the side panel and relocate to the air intake hole in the top panel. Use four screws to seal the four(4) mounting holes in the top panel next to the hole plug. Drill four(4) 7/64" diameter holes in the casing using the air intake coupling as the template. [!N The air intake coupling is sized for 2" PVC pipe. Install the combustion air pipe to the air intake coupling using RTV sealant to provide for future serviceability. Vent Pipe Connection Install the vent pipe grommet to the furnace panel. Locate the grommet in the furnace panel at a location directly away from the vent fitting on the combustion blower. The grommet snaps into the 3" hole plug from the furnace panel. NOTE: Depending on the installation position, the vent pipe grommet will be installed to the top panel or to the alternate location on the side panels. If needed, remove the 3" hole plug from the furnace panel and relocate to the open hole in the furnace panel. (See Figure 9 or Figure 18) Install the vent pipe to the rubber coupling, the vent fitting or the PVC...

Dieses Handbuch ist für folgende Modelle:
elektrische Heizungen - 9MPD125L20B1 (3.24 mb)
elektrische Heizungen - 9MPD100J20B1 (3.24 mb)
elektrische Heizungen - 9MPD100J14B1 (3.24 mb)
elektrische Heizungen - 9MPD080J16B1 (3.24 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien