Login:
Stimmen - 1, Durchschnittliche Bewertung: 3 ( )

Anleitung Marley Engineered Products, modell Electric Radiant Ceiling Heat Panels

Hersteller: Marley Engineered Products
Dateigröße: 70.75 kb
Dateiname: 2f6d32c1-ab5b-4e79-89c1-ddb60430b0ea.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Please carefully read the installation and maintenance directions shown in this manual. You should enjoy years of efficient heating comfort with this product from Marley Engineered Products . . . the industry’s leader in design, manufacturing, quality, and service. . . . The Employees of Marley Engineered Products WARNING ! Read Carefully - These instructions are written to help you prevent difficulties that might arise during installation of heaters. Studying the instructions first may save you considerable time and money later. Observe the following procedures and cut your installation time to a minimum. 1. To prevent possible electrical shock, disconnect ALL power coming to heater at main service panel before wiring or servicing. 2. All wiring must be in accordance with the National and Local Electrical Codes and the heater must be grounded as a precaution against possible electrical shock. 3. Verify the power supply voltage coming to the heater matches the ratings printed on the heater nameplate before energizing. 4. This heater is NOT suitable for use in hazardous locations as described by the National Fire Protection Association (NFPA). DO NOT use in areas where gasoline, paint or other flammable liquids are used or stored. DO NOT use in wet areas or areas where corrosive agents are present, such as marine, green house, chemical storage, swimming pool, or areas of high humidity, unless special custom panels are used. Special custom panels may be available for certain environments. Contact manufacturer for details. 5. To prevent a possible injury or fire from falling panels, panels MUST be securely fastened to the building structure. When T-bar Mounted: The T-bar grid work frame must be secured to the building to provide adequate support for the panels. Holes are provided in the sides of each panel for attachment of steel support wires for additional support of the panels where the T-bar grid work frame strength is questionable. Support wire must be steel and at least 18 gage (0.047 in. dia. / 0.119 cm. dia). When Surface or Recess Mounted: The surface or recess mounting frame accessory kits (Models ASF . . . or ARF . . . ) must be used. Kits must be sized to match heaters being used. Do not drill holes, drive nails, screws, etc., into or through panels. To do so may result in fire, electric shock, or permanent damage to heater. Surface or recess kits must be securely fastened to building structure using a minimum of four (4) 1/4 inch (.635 cm) diameter screws or bolts. 6. To prevent possible fire due to the overheating of wiring, all field wiring coming to heating panels must be rated at least 90° C when junction box is allowed to lie on top of heating panel or is enclosed between heater and ceiling above. When thermal insulation is used on top of heater, the junction box must be above the insulation. 7. Panels are intended for ceiling installation only. Do not install on walls, floor, etc. Painted (bottom) surface of panel is hot. Panels must be installed at least seven (7) feet off floor and should not be installed where panels can be easily contacted during use. GENERAL Marley Engineered Products Radiant Heating Panels are Although the heater contains thermal insulation, it will designed to provide comfort by warming the surfaces operate more efficiently in well insulated rooms. Four or below the heaters just as the sun warms surfaces through more inches of insulation above an exposed ceiling will radiant energy. This heating process heats objects in a increase both comfort and economy. room without having to bring the room air temperature up to the same level. These panels are ideal for spot heating The heaters are intended to be controlled by a remote wall in high heat loss areas. Panels may be installed side by mounted thermostat. The thermostat should be located in side or individually above areas requiring additional heat. If the same room on a side wall. It should also be above used as a sole source of heat, more heat will be felt while five feet above the floor, but not directly under the heater. standing directly under the panel. SAVE THESE INSTRUCTIONS 1 NOTE: For a period of time after the panels are put into operation the owner may notice a “new smell” coming from the heaters. This is expected on new installations and will dissipate after approximately 24 hours of operation. PAINTING 1. Heaters may be repainted. Do not remove paint from heaters. The surface must be first free of grease or oil. Use only a thin brush-on coat of high quality pure acrylic water base flat latex. An off-white will give better coverage. Do not paint with aluminum, oil base, vinyl-latex or rubber-base latex paint. T-BAR MOUNTING 1. The heater panels are designed for installation in T-Bar ceilings. CAUTION ! To prevent possible injury from falling panels, the T-Bar must be securely fastened to the building structure and capable of supporting the weight of the panel (30 pounds). Extra holes are provided for suspen...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien