Login:
Stimmen - 2, Durchschnittliche Bewertung: 4 ( )

Anleitung Generac Power Systems, modell 005325-0

Hersteller: Generac Power Systems
Dateigröße: 3.75 mb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


• Connect the battery cables to the battery. Attach negative battery cable last. • Close the 120VAC circuit breaker to the battery charger. • Measure the voltage at the battery before and after the charger is turned on. • Verify all AC electrical connections are tight at the circuit breaker and transfer switch. • Visually inspect entire area looking for loose paper, plastic wrappings, leaves, etc. • Check all hoses clamps fittings for leaks or damage. • Check all electrical plugs throughout the generator. Ensure each plug is seated correctly and fully inserted into its receptacle. • Verify the AUTO/OFF/MANUAL switch is in OFF position. • Open the valve to the engine fuel line. • Bleed the fuel system of air. (necessary for long fuel lines). • Open the generator main line circuit breaker. • Connect a manometer to the gas line and record the static pressure. It must be as listed in the Specifications. • Insert the fuse into the control panel. • Move the AUTO/OFF/MANUAL switch to the MANUAL position. The engine should now crank and start. • Check voltage at the generator terminals. • For 3-phase units, check phase rotation at the transfer switch terminals. The generator phase rotation must match the utility phase rotation. • Check for coolant, fuel, oil, and exhaust leaks. • Close the generators main line circuit breaker. • Turn the generator set off. • Connect the UTILITY supply to the transfer switch. • Set the AUTO/OFF/MANUAL switch to AUTO. • Disconnect utility power before the transfer switch. Engine should start, transfer to load. Run at least 15 minutes on generator power. Make certain all 3-phase loads are functioning correctly (correct phase rotation). • Reconnect Utility power Transfer switch will transfer back to Utility and engine will shut down within the given time parameters set up for the specific transfer switch and controller. • Install all covers, access plates and door panels. • Put the Owners Manual in a safe and accessible place. • Make certain the AUTO/OFF/MANUAL switch is in the AUTO position. • START-UP INSPECTION When a start-up is performed by an Authorized Service Dealer, a standard three-part form titled “Start-up Inspection for Standby Power Systems” (part no. 067377), should be completed by the installation technician or engineer. See page 1-3 for information on locating the nearest Authorized Service Dealer. The installer should complete the form and disseminate copies as follows: • White copy: Mail to Generac Warranty Department, P.O. Box 340, 211 Murphy Dr., Eagle, WI 531192062. • Pink Copy: For service file of installing dealer. • Yellow Copy: For the customer’s records. Install001 Rev. B 01/06 8-2 Standby Generator Sets Operation Standby Generator Sets Operation GENERATOR CONTROL AND OPERATION Refer to the appropriate control panel operator’s manual for this unit. OPERATING UNIT WITH MANUAL TRANSFER SWITCH If the generator was installed in conjunction with a transfer switch capable of manual operation only, the following procedure applies. A manually operated transfer switch is one that will not provide automatic start-up and does not include an intelligence circuit. • ENGINE START-UP AND TRANSFER For additional information, refer to the applicable control panel manual for this unit, as well as any literature pertaining to the specific transfer switch. DANGER . The Maintenance Disconnect Switch and the AUTO/OFF/MANUAL switches (if so equipped) must be set properly, or the generator will crank and start as soon as the utility power to the transfer switch is turned off. Refer to applicable control panel and transfer switch manuals for more information. . Do not proceed until certain that utility source voltage is available to the transfer switch and the transfer switch main contacts are set to UTILITY. . Do not attempt manual operation until all power supplies to the transfer switch have been positively turned off, or extremely dangerous - possibly lethal - electrical shock will result. . Transfer switch enclosure doors should be kept closed and locked. Only authorized personnel should be allowed access to the transfer switch interior. Extremely high and dangerous voltages are present in the transfer switch. In order to transfer load from the utility source to the generator, follow these directions: • Turn OFF or disconnect the utility power circuit to the transfer switch, using the means provided (such as the utility source main line circuit breaker). • Set the transfer handle to its UTILITY (NORMAL) position with load circuits connected to the utility power supply. • Set the standby generator’s main line circuit breaker to its OFF (or OPEN) position. • Start the generator. . Do not crank the engine continuously for longer than 30 seconds, or the heat may damage the starter motor. • Let engine stabilize and warm up. • Check all applicable instrument and gauge readings. When certain that all readings are correct, move the transfer switch manual handle to its STANDBY (GENERATOR...

Dieses Handbuch ist für folgende Modelle:
Stromerzeuger - 005324-0 (3.75 mb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien