Login:
Stimmen - 2, Durchschnittliche Bewertung: 3 ( )

Anleitung American Power Conversion, modell 200-240 VAC

Hersteller: American Power Conversion
Dateigröße: 422.12 kb
Dateiname: d78ab281-949b-4b2d-bed0-295795e897fd.pdf
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


The UPS filters small utility line fluctuations and isolates electronic equipment from large disturbances by internally disconnecting from utility line power. The UPS provides continuous power from the internal battery until utility power returns to safe levels or the battery is fully discharged. INSTALLATION Read the safety information sheet before installation. Unpacking Inspect the UPS upon receipt. Notify the carrier and dealer if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly. Check the package contents: • UPS (with batteries disconnected) • Two front bezels Removing the Batteries • Literature kit containing: • XLT/XLTW models only: Software CD • Smart-UPS User Manuals CD • XLI model only: Six output power cords • Serial cable • Product documentation, safety and warranty information • Network Management Card documentation The unit is heavy. To lighten the unit, remove the batteries. Refer to the unpacking instructions on the carton in which the unit is shipped. Specifications TEMPERATURE OPERATING STORAGE 32° to 104° F (0° to 40° C) 5° to 113° F (-15 to 45 ° C) charge UPS battery every six months This unit is intended for indoor use only. Select a location sturdy enough to handle the weight. Do not operate the UPS where there is excessive dust or the temperature and humidity are outside the specified limits. Ensure the air vents on the front and rear of the UPS are not blocked. MAXIMUM ELEVATION OPERATING STORAGE 10,000 ft (3,000 m) 50,000 ft (15,000 m) HUMIDITY 0% to 95% relative humidity, non-condensing WEIGHT UPS UPS WITH PACKAGING 244 lbs (111 kg) 284 lbs (129 kg) 1 Hardwiring Wiring must be performed by a qualified electrician. 1. Install a utility circuit breaker in accordance with local electrical codes (see tables below) for input wiring. 2. Switch the UPS input circuit breaker (see A) and utility circuit breakers OFF. 3. Remove the access panel (see B). 4. Remove circular knockouts. 5. Run wires through access panel to terminal blocks. Wire to ground block first. Adhere to all national and local electrical codes. (See tables and graphics.) 6. Use appropriate glands to achieve strain-relief on the hardwired input and output power cables. XLT, XLJ, AND XLTW MODELS Input Connection Output Connection (optional) Wire to L1, L2, and . Wire to L1A, L2A, and . System Wiring Voltage Current Full Load (Nominal) External Input Circuit Breaker (typical) Wire Size (typical) SURT8000XLJ, SURT8000XLT, SURT8000XLTW Input & Output 200/208/220/240 V 40 A 50 A / 2-pole for Input Wiring only 10mm2 #8 AWG SURT10000XLJ, SURT10000XLT, SURT10000XLTW Input & Output 200/208/220/240 V XLJ-50 A XLT-48 A XLTW-48 A 60 A or 63 A / 2-pole for Input Wiring only 16mm2 #6 AWG XLI MODELS Input Connections Output Connection (optional) Single-Phase: Wire to L1, N, and . Three-Phase: Wire to L1, L2, L3, N, and . Wire to L1A, N1, and . System Wiring Number of Phases Voltage Current Full Load (Nominal) External Input Circuit Breaker (typical) Wire Size (typical) SURT8000XLI Input 1 220/230/240 V 40 A 50 A / 2-pole 10mm2 Input 3+ Neutral 380/400/415 V 15 A / phase when online 40 A on L1 in bypass 50 A / 4-pole 10mm2 Output 1 220/230/240 V 40 A (not required) 10mm2 SURT10000XLI Input 1 220/230/240 V 50 A 63 A / 2-pole 16mm2 Input 3+ Neutral 380/400/415 V 18 A / phase when online 50 A on L1 in bypass 63 A / 4-pole 16mm2 Output 1 220/230/240 V 50 A (not required) 16mm2 2 7. XLI model only: For three-phase input, set the Input Phase Selector switch (see C) to ‘3’. For single-phase input, leave switch in default position of ‘1’. XLT/XLJ/XLTW MODELS 8. Switch the circuit breakers ON. 9. Check line voltages. 10. Replace the access panel. XLI MODEL L1 L2 L1A L2A OUTPUT INPUT OUTPUT INPUT L1 L2 L3 N C B L1A N1 B A A 3 Installing and Connecting the Batteries and Attaching the Front Bezel .... 4 CONNECTING POWER AND EQUIPMENT TO THE UPS 1. Hardwire the UPS (see Hardwiring). 2. Connect equipment to the UPS (cables not included for XLT/XLJ/XLTW models). 3. Turn on all connected equipment. To use the UPS as a master on/off switch, be sure that all connected equipment is switched ON. 4. Press the button on the front panel to power up the UPS. • The battery charges to 90% capacity during the first three hours of normal operation. Do not expect full battery run capability during this initial charge period. 5. Configure the Network Management Card (optional). OPTIONS Refer to the APC Web site, for available accessories. • External Battery Pack SURT192XLBP • Rail Kit SURTRK2 • Isolation Transformer • Service Bypass Panel CIRCUIT BREAKERS Input Circuit Breaker 8000/10000 VA XLI/XLJ/XLT/XLTW The UPS is protected from extreme overloads when in ON position. The breaker must be on for the UPS to operate. Output Circuit Breaker 8000/10000 VA XLJ/XLT/XLTW L6-20 250V 20A L6-30 250V 30A Output Circuit Breaker 8000/10000 VA XLI IEC 320-C13 10 A total current from four receptacles IEC 320-C19 16A for each rece...


Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien