Login:
Stimmen - 4, Durchschnittliche Bewertung: 3.5 ( )

Anleitung FMI, modell VFP30MV

Hersteller: FMI
Dateigröße: 464.77 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


Pressure) 1/8" NPT Tap Approved Flexible Gas Hose (if allowed by local codes) Sediment Trap Figure 14 - Gas Connection *Minimum inlet pressure for purpose of input adjustment. Continued 105071 11 FIREPLACE MANUFACTURERS INC. UNVENTED PROPANE/LP GAS LOG HEATER INSTALLATION Continued CHECKING GAS CONNECTIONS WARNING: Test all gas piping and connections for leaks after installing or servicing. Correct all leaks at once. WARNING: Never use an open flame to check for a leak. Apply a mixture of liquid soap and water to all joints. Bubbles forming show a leak. Correct all leaks at once. CAUTION: Make sure external regulator has been installed between propane/LP supply and heater. See guidelines underConnecting to Gas Supply, page 11. Pressure Testing gas Supply Piping system Test Pressures In Excess Of 1/2 PSIG (3.5 kPa) 1. Disconnect appliance with its appliance main gas valve (control valve) and equipment shutoff valve from gas supply piping. Pressures in excess of 1/2 psig will damage heater regulator. 2. Cap off open end of gas pipe where equipment shutoff valve was connected. 3. Pressurize supply piping system by either using compressed air or opening propane/LP supply tank valve. 4. Check all joints of gas supply piping system. Apply mixture of liquid soap and water to gas joints. Bubbles forming show a leak. 5. Correct all leaks at once. 6. Reconnect heater and equipment shutoff valve to gas supply. Check reconnected fittings for leaks. Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa) 1. Close equipment shutoff valve (see Figure 15). 2. Pressurize supply piping system by either using compressed air or opening propane/LP supply tank valve. 3. Check all joints from propane/LP supply tank to equipment shutoff valve (see Figure 16). Apply mixture of liquid soap and water to gas joints. Bubbles forming show a leak. 4. Correct all leaks at once. Open Equipment Shutoff Valve Closed Figure 15 - Equipment Shutoff Valve Equipment Shutoff Valve Figure 16 - Checking Gas Joints LocationPropane/ LP Supply Tank Pressure Testing Heater Gas Connections 1. Open equipment shutoff valve (see Figure 15). 2. Open propane/LP supply tank valve. 3. Make sure control knob of heater is in the OFF position. 4. Check all joints from equipment shutoff valve to control valve (see Figure 16). Apply mixture of liquid soap and water to gas joints. Bubbles forming show a leak. 5. Correct all leaks at once. 6. Light heater (see Operating Heater, pages 14 and 15). Check all other internal joints for leaks. 7. Turn off heater (see To Turn Off Gas to Appliance, page 15). Control Valve 12 105071 105071 13 OWNER’S MANUAL WARNING: Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury. INSTALLING LOGS INSTALLATION Continued Bottom Middle Log (#2) Metal Post Metal Post Groove Groove Grate Figure 18 - Installing Bottom Middle Log (#2) Peg Rear Log (#3) Grate Prong Grate Prong Groove in Back of Log Groove in Back of Log Top Middle Log (#4) Hole Peg Figure 20 - Installing Crossover Log (#4) Each log is marked with a number. These numbers will help you identify the log when installing. It is very important to install these logs exactly as instructed. Do not modify logs. Only use logs supplied with heater. 1. Place front logs (#1L and #1R) on top of the grate. Make sure the notches in the bottom of the logs fit over the grate prongs (see Figure 17). Push back of logs flush with metal grate bar. Note: 18" model has only one front log. 2. Rest bottom middle log (#2) behind metal posts on front burner. Make sure the grooves in the bottom of the log fit over the grate. Bring the log forward next to the metal posts. The pegs on the log must be on top (see Figure 18). 3. Slide the grooves in the back of the rear log (#3) against the rear grate prongs. Make sure the peg on the log is on top (see Figure 19). 4. Place the top middle log (#4) on the bottom middle log (#2). Make sure the pegs of the bottom middle log fit securely in the holes of the top middle log (see Figure 20). 5. Place the crossover log (#5) on the back log and the top middle log. Make sure the peg on the rear log is in the hole in the bottom of the crossover log. The crossover log should fit in the cutout of the top middle log (see Figure 21). Figure 17 - Installing Front Log (#1) Grate Prongs Metal Grate Bar Front Log (#1) Notch Figure 19 - Installing Rear Log (#3) Crossover Log (#5) Hole Peg Cutout Figure 21 - Installing Crossover Log (#5) FIREPLACE MANUFACTURERS INC. UNVENTED PROPANE/LP GAS LOG HEATER OPERATING HEATER FOR YOUR SAFETY READ BEFORE LIGHTING WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. A. This appliance has a pilot which must be lighted by hand. When lighting the pilot, follow these instructions exactly. B. BEFORE LIGHTING smell all around the app...

Dieses Handbuch ist für folgende Modelle:
Gas Heizthermen - VFP24MV (464.77 kb)
Gas Heizthermen - VFP18MV (464.77 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien