Hersteller: Alamo
Dateigröße: 3.49 mb
Dateiname: 214_02984405_-_axb_-_axtreme_boom_std_asy_man_07-06_02-07.pdf
|
Anleitung Zusammenfassung
Remove RH Rear Tire and Wheel (If Required, See Assembly Drawings sent with unit). Use proper Floor jack to lift the RH Rear Wheel, Support the tractor with proper jack stands rated appropriately for the tractors weight. The RH rear tire and wheel should be removed for this installation by using the Axtreme Boom (Asy. Man) 07/06 © 2006 Alamo Group Inc. Section 4 - 4 5. Install the new mount brackets to the tractor frame. (If Required, See Assembly Drawings sent with unit) The tank mounting brackets will bolt to the tractor the same as the factory brackets that were removed. Make certain that the brackets are installed correctly, the front bracket will have 2 outer holes (same as the tank see Figure 11 & 13). The rear bracket will have 1 hole in the outer end (same as the tank, See Figure 12 & 13) 6. Install The new Fuel tank onto Tractor if required.(If Required, See Assembly Drawings sent with unit) The new fuel tank with the gauge sending unit slide in on top of the new mounting brackets with the fuel cap to the front (See Figure 14). Connect lines to fuel pick up connections, connect wiring to fuel gauge sending unit. (See Figure 14) 7. Bolt Tank to the Mounting Brackets.(If Required, See Assembly Drawings sent with unit) Bolt the tank to the mounting brackets, there are two bolts in the front bracket and one bolt in the rear bracket. (See Figure 15) 8. Install New replacement Step.(If Required, See Assembly Drawings sent with unit) The new Replacement step is a bolt on weldment that will bolt to the new fuel tank with four bolts, note: below the step is painted yellow for clarity only (See Figure 16). Figure 13 Pick Up Tube UnitFront Rear Mounting Tabs Tank Figure 14 Front Bracket (2 Bolts) Rear Bracket (1 Bolt) Figure 15 Figure 16 Fuel Tank Replacement 4. Install Pick Up Tube & Gauge Sending Unit in new Tank. (If Required, See Assembly Drawings sent with unit) The Pickup gauge sending unit from the factory tank will be installed into the new tank. This is recommended to be done before mounting the new tank to the tractor (See Figure 13). The new tank will have a fuel capacity of 51 gallons. Axtreme Boom (Asy. Man) 07/06 © 2006 Alamo Group Inc. Section 4 - 5 Frame Installation Under Mount Frame Asy (24 & 30 ft are the same except for the LH weight) 30 ft model only Swing Cylinders Swing Cylinder Pivot Bushings Swing Cylinder Trunnion Mount Weldment Swing Cylinder Cover Boom Mount, Machined Boom Mount Attaching Pin, Short Pin Boom Mount Attaching Pin, Long Pin Lift Cyl Pin Turret / Boom Mount Pin Turret Asy, Machined LH Counter Weight Weight Attaching Pin, Long Pin Center Section Frame Weldment Axtreme Boom (Asy. Man) 07/06 Rev 02-20-07 © 2006 Alamo Group Inc. Section 4 - 6 Frame Installation: 1. Frame Components. The frame will include the rear axle mounts, a LH & RH Frame rail. Two front frame mounts, a LH & RH. One center frame weldment. (See Figure 17, 18, 19, 20 & 21) 2. Install Frame Components. The Frame components will only fit one way. The Frame components are a Bolt together assembly no welding will be required. The Frame components will bolt together and to the tractor using mostly 3/4" and/or 20 mm bolts. Each 3/4" & 20 mm bolt will use hardened flat washers, one on the head side when bolts go into the tractor castings. Two washers used when bolts use a nut and go through the frame. These hardened washers are important. Frame Installation Figure 17 LH Rear Frame Mount Weldment Figure 17 LH Rear Frame Mount Weldment Figure 18 RH Rear Frame Mount Weldment LH Front Frame Mount Weldment RH Front Frame Mount Weldment Figure 19 Figure 21 Center Frame Weldment Figure 20 Axtreme Boom (Asy. Man) 07/06 © 2006 Alamo Group Inc. Section 4 - 7 Frame Installation 3. Install Rear Frame Mount Rails. Rear frame rails consist of a LH & RH. We have started with the Left Hand Rail. The three point lift stabilizer brackets will need to be unbolted on both sides. In the illustration for the LH side we installed the frame with the LH rear tire and wheel still removed, this was done for clarity not because the wheel needs to be removed. Using a floor jack to lift the rail up under the rear axle (Stabilizer brackets for three point have been unbolted). Install the bolts up and into the three point stabilizer bracket and the tractors rear axle housing and snug the bolts down. Support the frame rail with a jack stand (or leave the floor jack under it). (See Figure 17 & 22). The RH Rear Frame Rail will basically install the same, bolts up under the tractor axle housing with the three point stabilizer bolt back up under frame rail (See Figure 18 & 23). The RH Rail looks different at the rear because the boom rest will bolt here later. 4. Install Front Frame Mount Rails. The Front Frame mount rails will consist of a RH & LH (See Figure 19, 20, 24 & 25) These will only fit one way as they have a gusset reinforcement on one side that will be showing to the outside when installed. These can be lifted by the technician install...