Login:
Stimmen - 2, Durchschnittliche Bewertung: 3.5 ( )

Anleitung Turbo Air, modell TCB-2SB

Hersteller: Turbo Air
Dateigröße: 203.34 kb
Dateiname:
Unterrichtssprache:en
Link zum kostenlosen Download Hinweise finden Sie am Ende der Seite



Anleitung Zusammenfassung


3 Beer Line & CO2 Line Installation Schematic Diagram..................................... 4 Caution "IMPORTANT" .................................................................................... 5 INSTALLATION................................................................................................ 7 CLEANING ....................................................................................................... 8 BASIC OPERATION ........................................................................................ 9 BEFORE REQUESTING SERVICE ............................................................... 10 WARRANTY..............................................................................................11~12 SERIAL NUMBER The serial number is located on the rating label which is on interior left side wall. Please retain the unit’s serial number for service purpose. 2 Turbo air 3 Turbo air INSTALLATION OF THE CASTERS According to model, refer to the assembly position of casters. TCB-2SD, TBD-2SD, TBB-2SB, TBB-2SG TCB-3SD, TBD-3SD, TBB-3SB, TBB-3SG TCB-4SD, TBD-4SD, TBB-4SB, TBB-4SG .This picture is a plan view of bottom cabinets. CB is an abbreviation of the caster with a brake. Other casters don't have a brake. TCB-2SD, TCB-3SD, TCB-4SD TBD-2SD, TBD-3SD, TBD-4SD TBD-2SB, TBD-3SB, TBD-4SB Screw(M4xL12) x 4EA Screw(M4xL12) x 4EA Draft Tower Assembly Rubber Gasket Draft Tower Assembly Rubber Gasket DRAFT ARMS TOWERS Installation Schematic Diagram * Assemble DRAFT TOWER as above drawing. BEER LINE & CO2 LINE Installation Schematic Diagram Distributor Fixture CO2 Line Beer Line#1 Beer Line#2 Beer #1 Beer #2 CO2 TCB-2SD, TCB-3SD, TCB-4SD TBD-2SD, TBD-3SD, TBD-4SD TBD-2SB, TBD-3SB, TBD-4SB * Assemble BEER LINE & CO2 LINE as above drawing. 4 Turbo air CAUTION "IMPORTANT" On direct-draw dispensers the drain is located at the front of the cabinet. DIRECT DRAW To plumb in the drain, connect 5/8” P.V.C. pipe to the 5/8” barbed fitting supplies with the unit. * Don't pull out or Turn drain line. 5 Turbo air CAUTION "IMPORTANT" TBB-2SG, TBB-3SG, TBB-4SG A. Excessively opening the door will cause the breakdown. B. Handle with care as shutting the door. 1. POWER CORD -Be sure the power cord is connected to the proper voltage, and amps should be run before connecting power cord to outlet. -A protected circuit of the correct voltage and amperage must be run for connection of the line cord. -Unplug the unit, whenever performing maintenance functions or cleaning the refrigerated cabinet. -Compressor warranty is void if burnt out due to low voltage. 2. RE-STARTING -If unpluged, wait 5 minutes before re-starting. 6 Turbo air INSTALLATION 1. GOOD AIR CIRCULATION -Do not place any object that will restrict air flow in front or back grills. -Turbo air highly recommends that there is ample space in rear of unit. 3 inches or more is best. 2. PLACE ON STRONG GROUND -Be sure the location chosen has a floor strong enough to support the total weight of the cabi...

Dieses Handbuch ist für folgende Modelle:
Dispenser - TBB-1SB (203.34 kb)
Dispenser - TBB-1SB (203.34 kb)
Dispenser - TBD-1SB (203.34 kb)
Dispenser - TBD-1SD (203.34 kb)

Bewertungen



Bewerten
Vorname:
Geben Sie zwei Ziffern:
capcha





Kategorien